The New Taipei City Government handles the project of adding protective nets to the Xizhi Container Road. From April 6th to May 5th, from 10:00 p.m. to 6:00 a.m. the next day, the one-way (towards the National Highway) lane will be closed for construction.

(Provided by the Works Bureau)

[Reporter Lai Xiaotong/New Taipei Report] The New Taipei City Government handles the project of adding a protective net to the Xizhi Container Road to improve the safety of the Xizhi cleaning team's workplace. From April 6th to May 5th, every day from 10:00 p.m. to 6:00 a.m. the next day At this point, the one-way (going to the National Highway) lanes will be closed for construction. People who want to go to National Highways No. 1 and No. 3 should cooperate with the volunteers to guide them to divert.

The New Taipei City Maintenance and Engineering Department pointed out that the Xizhi container access road is an important traffic road for large vehicles to and from the expressway and the urban area of ​​Xizhi. In order to prevent objects from falling down to the work site of the Xizhi cleaning team, it may injure the cleaning team and endanger personal safety. , A protective net will be added to ensure public safety.

The Maintenance Office said that the ramps connecting National Highway No. 1 and No. 3 include Xizhi Ramp, Wudu Ramp and Xintai No. 5 Ramp. During the construction period, please use passers-by to divert traffic according to the type of vehicle. General vehicles are diverted to Limen Street and Datong Road Section 2; Large trucks over 15 tons will enter the National Highway via the connecting ramp of Xintai 5th Road and Section 3 of Datong Road.

During the construction period, road diversion notice boards will be set up at each intersection, and volunteers will be arranged on site to guide the traffic.