The South Korean pop group BLACKPINK will perform in Kaohsiung for two consecutive days, and the Kaohsiung City Government will try their best to evacuate the crowd within 2 hours.

(Provided by Utopia)

[Reporter Huang Jialin/Kaohsiung Report] The popular Korean girl group "BLACKPINK" visited Taiwan for the second time in 4 years. Today and tomorrow, they will sing at the Kaohsiung World Games main stadium. Traffic control is implemented on the road, and the MRT is planned to be equipped with shuttle buses to evacuate 50,000 people within two hours.

The Bureau of Transportation pointed out that the tickets for the "BLACKPINK" concert have already been sold out. It is estimated that 100,000 people will crowd the World Games main venue for two consecutive days. Cycling, not driving”, get out of the Red Line R17 Shiyun Station and walk for 5 to 8 minutes to the concert venue.

Please read on...

For the part of the exit and transportation, the public can also use the MRT Red Line R17 Shiyun Station to transfer. The MRT will increase the number of trains and extend the operating hours according to the crowds; Zuoying Station” free shuttle bus for the end of the show, transfer to HSR Zuoying Station/Taiwan Railway New Zuoying Station, the free shuttle bus service time for the end of the show is from 21:30 to 23:30 on the 18th and 20th on the 19th From 30:00 to 22:00.

The pedestrian walkway system around the World Games is complete, and the Gao City Hall also encourages the public to walk to Zuoying Station more often; the Gao City Hall estimates that the main crowds can be completed in about 2 hours with the full capacity of the MRT and the shuttle bus Evacuation operations.

In addition, in order to serve fans from other places, Taiwan Railways added northbound trains at 23:30 on the 18th and 22:30 on the 19th. For detailed train information, please visit the website of Taiwan Railways. Relevant traffic control and transportation measures will be determined on the day of the event. The crowd situation can be adjusted flexibly and based on on-site implementation measures.