The two-lane road on Huxing South Road was widened to a four-lane road.

(Photo by reporter Zheng Xukai)

[Reporter Zheng Xukai/Yunlin Report] Yunlin Huwei High-speed Railway designated Huxing South Road to be widened and opened to traffic today (14th). Announcement is all open.

The completion and opening ceremony of Huxing South Road widening and opening to traffic was held by Zhang Lishan, Mayor of Yunlin County, Ding Xuezhong, Mayor of Huwei Town, Lin Jiahong, Chairman of the Township Representatives, Chen Junlong, Wang Yuqi, Huang Meiyao, Cai Mingshui, Zhang Weixin, county councilors, and others. Soil discussion ceremony, officially open to traffic.

Please read on...

Huxing South Road is located in the high-speed rail designated area, with a length of about 226 meters. After the completion of the high-speed rail joint external road in 2018, from Wenke Road to Huxing South Road through the south side road, the entire line has two-way four-lane roads, and the main roads in the area include east-west Xuefu 1st Road, Xuefu Road, Dalong Road, Jiancheng Road, and north-south Yongxing Road, Keyuan Road, Kehu Road, etc., all have a width of more than 20 meters. Only Huxing South Road has only two-way two-lane roads. Become the bottleneck of the road outside the high-speed rail.

Zhang Lishan said that the local government has long complained that the bottleneck of traffic congestion has affected traffic safety. The county government has failed to apply for subsidies from the central government, so it decided to raise funds to handle it by itself. The bottlenecks of the external roads have all been cleared up so far, and the construction of the external roads from Huwei to Douliu has also started in succession in the future.

The widening of Huxing South Road was completed, and the county magistrate Zhang Lishan led a team to hold a blessing opening ceremony.

(Photo by reporter Zheng Xukai)