Yesterday the service was affected due to a capacity deficit from 5:25 p.m. to 8:19 p.m. (02:54 p.m.).

The maximum impact at night was 399 MW at 6:50 p.m., coinciding with peak hour.

The availability of the National Electric System at 07:00 hours is 2068 MW

and the demand is 1970 MW, with the entire system with service.

Unit 6 of the CTE Mariel and the CTE Guiteras unit are out of service due to a breakdown.

Unit 4 of CTE Cienfuegos, unit 1 of CTE Felton and units 4 and 6 of CTE Renté are under maintenance.

Limitations on thermal generation (204 MW) are maintained.


In distributed generation, 885 MW are unavailable due to failure and 317 MW are under maintenance.

For peak hours, the completion of unit 6 of Energas Boca de Jaruco with 30 MW and the entry of 287 MW in diesel engines are estimated.

With this forecast, an availability of 2,415 MW

and a

maximum demand of 2,830 MW

are estimated for the peak hour

, for a

deficit of 415 MW

, so if the forecast conditions are maintained, an affectation of 485 MW is forecast during this time.

(With information from the UNE)