Schematic diagram of the completion of the underground parking lot in the square in front of the Cultural Affairs Bureau.

(Provided by Peach City Transportation Bureau)

[Reporter Xu Zhuoxun/Taoyuan Report] In order to alleviate the problem of parking demand, the Taoyuan City Government sought funding subsidies for forward-looking infrastructure construction last year. It will use 483 million yuan to build the "Underground Parking Lot in Front of the Cultural Affairs Bureau". However, the original planned car size was 159 There are 716 seats for motorcycles. The Bureau of Transportation considers that the three-dimensional parking lot on Xiamen Street will be opened in September. Locomotives are more difficult to park than cars during peak hours.

Wei Guangyu, Section Chief of Parking Management Engineering of the Transportation Bureau, said that there are 1,275 motorcycle parking spaces around the municipal administrative park. There are a large number of people who come here to work and contact business every day. The traffic volume of motorcycles far exceeds the existing parking spaces. Although the problem of illegal parking is not serious, people have to detour to find parking spaces or park on the first line of Taiwan (Zhongshan Road) or even further away, which may cause traffic problems.

Please read on...

The Bureau of Transportation estimates that the three-dimensional parking lot on Xiamen Street will be opened in September this year, which can provide 227 seats for cars. In order to relieve the huge parking pressure of motorcycles, the original plan to provide 159 seats for cars and 716 seats for motorcycles will be located on the ground floor of the square in front of the Cultural Affairs Bureau. "Parking lot" has been changed to locomotive compartments with a total of 1,608 seats. The parking fee is estimated to be 30 yuan each time. After completion, the current situation is expected to be greatly improved.

Wei Guangyu said that the parking lot base belongs to government land, with an area of ​​about 3,608 pings, and the construction cost is four.

8.3 billion yuan, with a subsidy of 173 million yuan in the forward-looking plan. A three-story underground parking lot will be built. Considering the height difference in the square in front of the Cultural Affairs Bureau, entering the first basement floor from the square, and entering at the intersection of Min'an Road The first floor is above ground, and the entrance and exit of the performing arts hall next to the Cultural Affairs Bureau are included in the scope of the project to improve the small and narrow facade of the performing arts hall.