As it is known, Sports Palace meeting high standards is being built in Ganja city.

Niyazi Bayramov, the head of the Ganja City Executive Authority, visited the Sports Palace for the next time and got acquainted with the work carried out here.

APA reports that it was informed by the Ganja City Executive Authority.

The head of the city was informed that the final design works are being carried out in the hotel section of the Palace.

The communications of the ventilation, cooling, fire protection and low-flow sections are being completed, a new reinforced concrete floor has been built on the ceiling of the shooting hall.

In addition, the construction of new SPA, fitness, chess hall, yoga and aerobics halls is also being continued.

11 elevators have been designed in the building, two of which are designed for people with disabilities.

Stained glass works are done on the side facades.

Currently, the rest of the imported ventilation equipment is being transported.

Niyazi Bayramov, after familiarizing himself with the ongoing work, gave the relevant tasks and recommendations.

It should be noted that Ganja Sports Palace will have a large gym with 2,092 seats, an audience hall with 1,410 seats, a restaurant with 100 seats and a hotel with 160 beds.

The Ganja Sports Palace, which consists of two floors, a basement and two additional floors, will have a large gym that meets international standards, a swimming pool, a place for holding international tournaments, schools for chess, wrestling, boxing and other types of sports.