The project involves the removal of trees and branches equivalent to trees and branches that are directly under construction in the area agreed with the Ministry of Ecology and Natural Resources.

The EPA reports that Rustam Rogebov, head of the Hydroelectric Service of the Energy Industry Operator, said this at a public hearing on the report "Evaluation of Environmental Impact" for the construction of small water power plants (KSES) buildings, water pipes, and raided water pipes by the ASC on the Oxchuchai River.

He said that the maintenance of the river ecosystem was also intended to preserve ecological flows, to avoid hydromorphological changes, and to avoid hydromorphological changes:

"The accumulation and use of the upper fertile layer of soil taken from the infrastructure area, the failure of selected hydrogregates to affect water quality, and the structure of the steering machine to prevent oil and other harmful substances from mixing in the water, and to return the water to the river at a lower stream without any change in temperature and other quality indicators."